- Home > Supply Leads > JDMZ3-40, JDMZ3-80, JDMZ3-150 AC electromagnetic loss of power brake
- Product Categories
- Gear oil pump vane pump
- Clutch | Brakes
- Hydraulic valves | hydrauli..
- Cooler | air-cooled machine
- Instrument valves off valve
- Solenoid valve | pneumatic ..
- FRL Air Source Package
- Rectifier
- Pressure switch
- Hydraulic accessories
- JDMZ3-40, JDMZ3-80, JDMZ3-150 AC electromagnetic loss of power brake
- JDMZ3-40, JDMZ3-80, JDMZ3-150, AC Electromagnetic Power the Wenner AC Electromagnetic Power, the details of the manufacturers of AC Electromagnetic PowerJDMZ3-40, JDMZ3-80, JDMZ3-150, AC Electromagnetic Power the Wenner AC Electromagnetic Power AC electromagnetic loss of power brake manufacturer1 Introduction
JDMZ3 Series AC Electromagnetic Power for power from the (release), the off spring brake friction brakes. And Y series electric supporting YEJ series electromagnetic brake three-phase asynchronous motor. Widely used in metallurgy, construction, chemical, food, machine tools, packaging machinery, and power (anti-insurance) brake and other occasions.
This brake has a compact structure, easy installation, wide applicability, low noise, high operating frequency, sensitive, reliable braking, etc., is one ideal implementation of automation components.
Two performance parameters:050815304080150Supporting YEJ motor machine frame size
718090100112132160Rated braking torque (Nm)
5815304080150Rated Power P20 ℃ (W)
254050607590110Maximum working air gap & max (mm)0.8 A A A A 1.2 1.2 Rated voltage (V DC)
380V (three phase) 50HzAllow the maximum operating speed (rpm)
3000 3000 3000 3000 3000 3000 3000 3, Outline and installation size:
D1
D2
D3
D4
L1
L2
L3
L4
L5
L6
d
b
h
M
δ
JDMZ3-05
102
90
20
10
20
2.5
33
56.3
60
120
14.8
5
16.2
3 × M5
0.3
JDMZ3-08
118
105
26
10
20
3.5
33
62.3
75
135
19.8
6
22.6
3 × M5
0.3
JDMZ3-15
128
114
32
10
25
3.5
39
68.4
80
140
24.8
8
28.1
3 × M6
0.4
JDMZ3-30
147
133
38
10
30
3.5
45
80.4
90
150
29.5
8
32.8
3 × M6
0.4
JDMZ3-40
167
150
38
12
30
3.5
45
80.4
102
180
29.5
8
32.8
3 × M8
0.4
JDMZ3-80
188
170
45
12
30
3.5
45
87.5
112
195
39.5
12
42.8
3 × M8
0.5
JDMZ3-150
222
202
52
12
35
4.0
51
94.5
113
275
44.5
12
47.8
4 × M10
0.5
4, the installation:
Installation Notes
● friction plate and armature surface should oil be kept clean.
● Install the air gap "&"
● spline bushing shall axial movement.
● After installation, you must spin the hollow bolt in the motor cover or the flange
5, the installation diagram
1, the mounting screws
2, the hollow bolt
3, the brake disc
4, gear sets
5, the armature assembly
6, the yoke assembly
7, the spring
8, Motor Cover
9, the manual release device